advant navis office space

Gulshan 129

Gulshan One29 in Sector-129, Noida by Gulshan Homz is a commercial project.

The project offers Shops and Office Spaces and it is well connected by different modes of transportation and built by combining the strengths of well-grounded experience with the dynamic needs of modern times.

Proximities

  • 10 mins drive from DND
  • 10 mins drive from J S hospital
  • 9 mins drive from DPS
  • 15 mins drive from Indusland Bank
  • 13 mins drive from The Cake Shop
  • 13 mins drive from The Caspian

Overview

  • Towers: 5
  • Floors: 23
  • Total Project Area: 6.14 acres (24.85K sq. m.)
  • Open Area: 80 %

Features

  • Virtual offices and fully serviced office spaces
  • 2 level basement parking
  • Towers are interconnected to each other via sky bridge
  • Fully serviced offices
  • Business center with fully furnished incubation services
  • Integrated building management system
  • Comprehensive automated access control and visitor management system
  • Energy monitoring, management and conservation systems
  • LED lights for exterior and interior common areas
  • Pollution free atmosphere
  • Emergency voice evacuation system

Walls

  • Aerated concrete blocks on exposed surface with low overall thermal heat transfer coefficient
  • Insulated roof using 65 mm thick extruded polystyrene to achieve low overall thermal heat transfer coefficient
  • Provision of ample natural lighting to optimize artificial lighting
  • Floor to floor height of 42 meters

Electrical System

  • 33KV incoming power supply from electricity board grid
  • Transformers with on load tap changers provided for superior voltage regulation
  • All HT equipment like HT breakers and transformers shall be located away from building to avoid effect of electromagnetic radiations
  • LV Power supply duly terminated at each floor through solid conductor rising mains with a suitable rating tap off box
  • Dual supply energy meters at each floor for metering city and DG power separately
  • Dedicated risers for electrical and communication facilities on each floor with due consideration for avoiding electromagnetic radiations
  • Use of high efficiency motors for all moving equipment

 

HVAC System

  • Highly efficient low power consuming water chilling machines
  • Use of high efficiency blowers in HVAC System
  • Provision in air handling unit motors to install variable frequency drives by individual tenants
  • Indoor air quality as per ASHRAE standard
  • Superior noise and vibration control measures to prevent disturbance to tenant operations

Latest Blogs

 Designing a Productive Commercial Office Space

 Designing a Productive Commercial Office Space

Businesses are seeing more and more the benefits of creating workplaces that are flexible enough to accommodate a staff that…

Commercial Office Space: Trends in Modern Workplace Solutions

Commercial Office Space: Trends in Modern Workplace Solutions

There are now differences between conventional and modern ideas of…

Office Interior Design: Tips for Shared Workspaces

Office Interior Design: Tips for Shared Workspaces

Do you need inspiration for workplace design ideas? This article looks at…

Reset password

Enter your email address and we will send you a link to change your password.

Powered by Estatik